Skip to content

Titanic: Adventure out of Time – Adjusting the Boiler Control

by Malcolm Schmidt part 12 of 17 about 1 minute to read

ADJUSTING THE BOILER CONTROL

 

 
1) Open the red valves (1, 2, 3) to maximum – in the order they are
numbered
2) Slowly raise the boiler control lever (4) until the needle is in
the green zone (5)
 
 
 


 

Parts of this guide

One guide by Malcolm Schmidt, in 17 parts. They read in order, and the part you are on is marked.

  1. Walkthrough By Malcolm Schmidt
  2. London Flat
  3. Directions
  4. Finding the Rubaiyat
  5. Finding the Painting
  6. Finding the Necklace
  7. Finding the Notebook
  8. The Titanic Is Sinking
  9. Various Endings
  10. Decoding the Telegram with the Cryptograph
  11. How to Develop the Films
  12. Adjusting the Boiler Control
  13. How to Send the Telegram
  14. Climbing the Smokestack
  15. If Zeitel Has the Notebook
  16. If Vlad Has the Notebook
  17. How to De-activate the Bomb

Other guides for Titanic: Adventure out of Time